+966 58 302 0877betagreenksa@gmail.com
Sat–Thu 8:00–20:00
+966 58 302 0877
Request Quote
Beta Green Plastic Factory
Home
Facility
Certifications
Contact Us
Request Quote
Beta GreenPlastic Factory

Saudi Arabia's trusted supplier for PVC, sanitary, electrical, lighting, hardware, and water solutions.

ISO Certified · SASO Approved · Saudi-Made Since 2002

Quick Links

  • Home
  • About Us
  • All Products
  • All Projects
  • Certifications
  • Product Catalogue
  • Contact Page
  • Request a Quote

Product Categories

  • PVC Pipes & Fittings
  • Sanitary Ware
  • Bathroom Solutions
  • Electrical & Lighting
  • Water Tanks & Heaters
  • Smart Home Solutions
  • Door Handles & Locks

Get In Touch

+966 58 302 0877WhatsAppbetagreenksa@gmail.com
Al Hijra Road, Madinah Munawarah, Saudi Arabia
Business HoursSun – Thu: 8:00 AM – 5:00 PM

Saudi Market

KSA-manufactured products

ISO Certified

SASO & international standards

20+ Years

In manufacturing since 2002

Quality Assured

Rigorous in-house QC process

© 2025 Beta Green Plastic Factory. All rights reserved.

Privacy Policy·Terms of Use
عربي
  1. Home
  2. /
  3. Projects
  4. /
  5. NEOM Multi-Service Utility Corridor
Mega ProjectsFeatured Project

NEOM Multi-Service Utility Corridor

NEOM, Tabuk Province2024NEOM Development Authority
Project Overview

NEOM Multi-Service Utility Corridor

As part of the landmark NEOM development, Beta Green Plastic Factory was selected to supply multi-service underground utility duct systems for Phase 1 infrastructure. The scope included water supply mains, electrical conduit runs, and telecommunications duct banks across a 12 km section. All products were manufactured to IEC and ISO standards and delivered to a precise phased schedule aligned with NEOM's construction sequencing.

Project Information

Client
NEOM Development Authority
Location
NEOM, Tabuk Province
Category
Mega Projects
Products Supplied
  • uPVC Duct Pipes (Electrical)
  • PVC Utilities Duct
  • uPVC Watermain Pipes DN250
  • Customized Fittings
Standards & Certifications
IEC 61386ISO 6993BS EN 61386SASO
Project Facts

Key Project Data

12 kmCorridor Length
3 systemsProduct Types
IEC / ISO / BS ENStandards
24 monthsDelivery Period
Giga ProjectProject Tier
Completed 2024Project Status
Contract ValueSAR 22.8M
Project Challenges

What We Had to Solve

Challenge 01

Coordinating supply across a remote construction site with evolving access logistics

Challenge 02

Meeting stringent NEOM quality standards for multi-service duct bank systems

Challenge 03

Simultaneous delivery of three distinct product types to a phased construction schedule

Our Approach

How We Delivered

Solution 01

On-site material staging area established in coordination with NEOM logistics team

Solution 02

Third-party quality inspection at factory before dispatch meeting all NEOM specifications

Solution 03

Integrated production scheduling across water, electrical, and telecom product lines

Project Gallery

Project Visual Record

Related Projects

More Projects

2023
Water InfrastructureFeatured

Riyadh Water Distribution Network

Riyadh, Saudi Arabia
2023
View Project
2023
Electrical Ducting

King Fahd Road Underground Electrical Ducting

Riyadh, Saudi Arabia
2023
View Project
Ongoing
2024
CommercialFeatured

Qiddiya Entertainment City Utility Infrastructure

Qiddiya, Riyadh Province
2024
View Project
Start Your Project

Need Similar Piping Solutions?

Our engineering and sales team can replicate this quality on your infrastructure project. Request a quotation or speak to a specialist today.

Request a Quote
View All Projects