+966 58 302 0877betagreenksa@gmail.com
Sat–Thu 8:00–20:00
+966 58 302 0877
Request Quote
Beta Green Plastic Factory
Home
Facility
Certifications
Contact Us
Request Quote
Beta GreenPlastic Factory

Saudi Arabia's trusted supplier for PVC, sanitary, electrical, lighting, hardware, and water solutions.

ISO Certified · SASO Approved · Saudi-Made Since 2002

Quick Links

  • Home
  • About Us
  • All Products
  • All Projects
  • Certifications
  • Product Catalogue
  • Contact Page
  • Request a Quote

Product Categories

  • PVC Pipes & Fittings
  • Sanitary Ware
  • Bathroom Solutions
  • Electrical & Lighting
  • Water Tanks & Heaters
  • Smart Home Solutions
  • Door Handles & Locks

Get In Touch

+966 58 302 0877WhatsAppbetagreenksa@gmail.com
Al Hijra Road, Madinah Munawarah, Saudi Arabia
Business HoursSun – Thu: 8:00 AM – 5:00 PM

Saudi Market

KSA-manufactured products

ISO Certified

SASO & international standards

20+ Years

In manufacturing since 2002

Quality Assured

Rigorous in-house QC process

© 2025 Beta Green Plastic Factory. All rights reserved.

Privacy Policy·Terms of Use
عربي
  1. Home
  2. /
  3. Projects
  4. /
  5. King Fahd Road Underground Electrical Ducting
Electrical Ducting

King Fahd Road Underground Electrical Ducting

Riyadh, Saudi Arabia2023Saudi Electricity Company (SEC)
Project Overview

King Fahd Road Underground Electrical Ducting

Saudi Electricity Company selected Beta Green Plastic Factory to supply uPVC electrical duct pipes for the undergrounding of 45 km of high-voltage cable routes along King Fahd Road in Riyadh. Products were manufactured to IEC 61386 and BS EN 61386 standards with mechanical protection classifications suitable for direct burial in road corridors. The project formed part of Saudi Arabia's national urban beautification programme.

Project Information

Client
Saudi Electricity Company (SEC)
Location
Riyadh, Saudi Arabia
Category
Electrical Ducting
Products Supplied
  • uPVC Duct Pipes (Heavy Duty)
  • PVC Utilities Duct
  • Junction Box Connections
  • Customized Duct Bank Systems
Standards & Certifications
IEC 61386BS EN 61386SASO
Project Facts

Key Project Data

45 kmRoute Length
High Voltage (HV)Cable Type
Heavy DutyProtection Class
10 monthsDelivery Period
IEC 61386 / BS EN 61386Standard
Completed 2023Project Status
Contract ValueSAR 8.3M
Project Challenges

What We Had to Solve

Challenge 01

Installation beneath one of Riyadh's busiest arterial roads with minimal surface disruption

Challenge 02

Mechanical protection requirements for HV cable routes under road loading

Challenge 03

Coordination with SEC operations to maintain continuity of electricity supply during works

Our Approach

How We Delivered

Solution 01

Heavy-duty mechanical protection class duct specified for all road crossing zones

Solution 02

Trenchless horizontal directional drilling used for active road crossings

Solution 03

Night-only installation windows at major intersections coordinated with traffic authority

Project Gallery

Project Visual Record

Related Projects

More Projects

2024
Mega ProjectsFeatured

NEOM Multi-Service Utility Corridor

NEOM, Tabuk Province
2024
View Project
2023
Industrial

Eastern Province Industrial Complex

Dammam, Eastern Province
2023
View Project
2023
Utilities

Abha International Airport Utility Systems

Abha, Asir Province
2023
View Project
Start Your Project

Need Similar Piping Solutions?

Our engineering and sales team can replicate this quality on your infrastructure project. Request a quotation or speak to a specialist today.

Request a Quote
View All Projects