+966 58 302 0877betagreenksa@gmail.com
Sat–Thu 8:00–20:00
+966 58 302 0877
Request Quote
Beta Green Plastic Factory
Home
Facility
Certifications
Contact Us
Request Quote
Beta GreenPlastic Factory

Saudi Arabia's trusted supplier for PVC, sanitary, electrical, lighting, hardware, and water solutions.

ISO Certified · SASO Approved · Saudi-Made Since 2002

Quick Links

  • Home
  • About Us
  • All Products
  • All Projects
  • Certifications
  • Product Catalogue
  • Contact Page
  • Request a Quote

Product Categories

  • PVC Pipes & Fittings
  • Sanitary Ware
  • Bathroom Solutions
  • Electrical & Lighting
  • Water Tanks & Heaters
  • Smart Home Solutions
  • Door Handles & Locks

Get In Touch

+966 58 302 0877WhatsAppbetagreenksa@gmail.com
Al Hijra Road, Madinah Munawarah, Saudi Arabia
Business HoursSun – Thu: 8:00 AM – 5:00 PM

Saudi Market

KSA-manufactured products

ISO Certified

SASO & international standards

20+ Years

In manufacturing since 2002

Quality Assured

Rigorous in-house QC process

© 2025 Beta Green Plastic Factory. All rights reserved.

Privacy Policy·Terms of Use
عربي
  1. Home
  2. /
  3. Projects
  4. /
  5. Madinah Water Distribution Expansion
Water Infrastructure

Madinah Water Distribution Expansion

Madinah, Saudi Arabia2022Madinah Regional Municipality
Project Overview

Madinah Water Distribution Expansion

Beta Green Plastic Factory supplied pressure-rated uPVC watermain pipes for Madinah's water distribution network expansion programme, serving rapidly growing residential and commercial zones on the city's periphery. Pipes were supplied in DN110 to DN315 sizes to BS EN ISO 1452 standards, with a combined total of 95 km delivered over 14 months.

Project Information

Client
Madinah Regional Municipality
Location
Madinah, Saudi Arabia
Category
Water Infrastructure
Products Supplied
  • uPVC Watermain Pipes DN110
  • uPVC Watermain Pipes DN200
  • uPVC Watermain Pipes DN315
Standards & Certifications
BS EN ISO 1452SASO
Project Facts

Key Project Data

95 kmTotal Pipe Length
DN110 – DN315Pipe Size Range
14 monthsDelivery Period
BS EN ISO 1452 / SASOStandard
Completed 2022Project Status
Contract ValueSAR 5.9M
Project Challenges

What We Had to Solve

Challenge 01

Installation in religious heritage zones requiring specialist access permissions

Challenge 02

Coordination with pilgrimage season schedules for construction access

Challenge 03

Varied ground conditions across the expansion zones

Our Approach

How We Delivered

Solution 01

Heritage zone installation programme developed with municipality guidance

Solution 02

Construction windows planned around pilgrimage season blackout dates

Solution 03

Geotechnical assessment incorporated into pipe specification selection

Project Gallery

Project Visual Record

Related Projects

More Projects

2023
Water InfrastructureFeatured

Riyadh Water Distribution Network

Riyadh, Saudi Arabia
2023
View Project
2022
Water InfrastructureFeatured

Mecca Holy Sites Water Supply Network

Mecca, Saudi Arabia
2022
View Project
2022
Sewer Networks

Dammam Sewer Network Rehabilitation

Dammam, Eastern Province
2022
View Project
Start Your Project

Need Similar Piping Solutions?

Our engineering and sales team can replicate this quality on your infrastructure project. Request a quotation or speak to a specialist today.

Request a Quote
View All Projects